Top News
News
Insights
Search
Sign in
·
Subscribe
Insights
/
Locations
/ Langreo, Principality of Asturias
Langreo, Principality of Asturias
⬇
PDF briefing
ES
1 mention
Located in
Spain
Last 7 days
0 mentions
Flat
no prior activity
Last 30 days
0 mentions
▼ 100%
vs 1 prior 30 days
Last 90 days
1 mention
New
no prior activity
Often mentioned with · Organizations
Universidad de Oviedo (University of Oviedo)
Public university engaged in teaching and research, including energy, mining and environmental technologies.
institution
Spain
1 mention
ALSA Grupo S.L.U.
Passenger transport company specialized in interurban and regional bus services.
company
Spain
1 mention
European Union – RFCS (Research Fund for Coal and Steel)
EU funding instrument to support research and innovation in coal and steel regions, including transition projects.
other
European Union
1 mention
Organizations
Subscribe to access the full organizations catalog
Subscribe →
Often mentioned with · Technologies
Hydrogen‑powered mobility (fuel cell and combustion buses)
As part of Mine‑to‑H2, ALSA plans to introduce two new interurban bus models that use green hydrogen produced at Pozo Fondón: one equipped with a fuel cell powertrain and the other using hydrogen in direct combustion engines.[1] These buses will operate on routes in the central Asturian area to demonstrate the decarbonization of regional road transport using locally produced renewable hydrogen.[1][7]
1 mention
District heating with geothermal and biomass integration
The District Heating Pozo Fondón is an existing network that supplies heat generated from geothermal energy (mine water) and biomass to surrounding buildings, already operating on the former mine site and recently recognized by the International Energy Agency with a Global District Energy Climate Award.[1] The Mine‑to‑H2 project plans to integrate the waste heat from electrolysis into this district heating system, maximizing energy efficiency and reinforcing the site’s role as a multi‑energy hub.[1]
1 mention
Photovoltaic power plant on reclaimed mining land
The project includes a photovoltaic plant installed on land from a former HUNOSA open‑pit coal mine in the area of Mieres–Langreo, providing part of the renewable electricity needed for hydrogen production at Pozo Fondón.[1] This PV installation is a key pillar for ensuring that the hydrogen qualifies as green by being produced with renewable power and exemplifies the reuse of degraded mining land for solar energy.
1 mention
Technologies
Subscribe to access the full technologies catalog
Subscribe →
In the news (1)
Green Hydrogen Production Hub in Asturias Moves Ahead as Mine-to-H2 Secures Final Approval
1 month 23 days ago
Get the H2 Markets Brief
what 120,000+ hydrogen industry pros read every Monday.
×
Get the H2 Markets Brief
what 120,000+ hydrogen industry pros read every Monday.